Column Cutting Beam System "Eco Ram Method"
A method to reduce the intermediate piles of temporary earth retention, simplifying the pile driving work and the erection and dismantling of struts.
The "Eco Lam Method" is a construction technique that reduces the number of intermediate piles by using columns (square steel pipes) with high buckling performance. In conventional methods, intermediate piles are necessary, which requires creating floor openings at the intermediate pile locations during the concrete slab pouring. This necessitated additional reinforcement for the openings, the installation of formwork for the openings, and sealing the openings after the construction was completed. With this method, the reduction of intermediate piles eliminates the need for such ancillary work. 【Features】 ■ Improved structural quality ■ Shortened construction period ■ Enhanced safety ■ Increased work efficiency ■ Improved cost-effectiveness *For more details, please download the PDF or feel free to contact us.
- 企業:ジェコス
- 価格:Other